This
bridge is the link between the Core Island (Precinct 4) and
Precinct 7. Seri Saujana Bridge is strategically located at the
main entrance into the Core Island from the south via the upgraded
B15 road and KL-KLIA highway.
It is a new concept of the cable stayed Arch bridge. The bridge is
controlled by the principal design parameters to reflect a
transparent elegant and futuristic slender looking structure, with
an overall single span of 300m and total width of 32m.
There are dual three lane carriageways. The deck level varies from
RL 35.25m at abutment to RL 35m at centre of the bridge.